| Call: 0845 873 8612 |
To successfully receive a grant there are a number of stages you must go through. To assist you in this, we have listed these stages below.
Receiving a grant is dependent on a number of qualifying criteria. Before applying to the LCBP, you must have:
SIG Energy Management teams are highly trained in the consultation for, and installation of renewable technologies. Once we have received your request for a quotation, we will arrange a time convenient to you to complete a survey of your property. This will enable us to specify the right renewable solution and provide a full quote for supply and installation. We will also provide you with all the essential paperwork and details necessary to enable you to complete your application, such as the expected energy saving, system costs and the installer accreditation number. Our teams are LCBP registered installers and use certified products.
To request a quotation, please complete the the form Solar Hot Water System Surveys
Applications to the LCBP can be made through two phases, and it is important to apply to the phase relevant to you. Please select one the links below:
Having received your Grant Offer Letter confirming your acceptance for a grant, you should contact us and we will arrange a convenient time to install your renewable energy system. It is critical that this work is concluded before the grant expiry date which is stated on your letter, for a guide, please see the table below:
Installations on buildings under construction:
Installations on existing buildings:
Upon completion we will provide you with a Completion Certificate to enable you to receive your grant payment.
The grant will be paid once we have completed the installation which must be before the expiry date of your grant, which is clearly stated on your Grant Offer Letter. The Grant Claim Form must be sent in with the following documentation:
All correspondence should be posted to:
Grant Administration – Low Carbon Buildings Programme.